sfarnell said:I order mine last week from Zone music, about 10 miles from the Mesa factory. I paid a 50% deposit. I was told it will be 60 - 90 days.
mesadude said:sfarnell said:I order mine last week from Zone music, about 10 miles from the Mesa factory. I paid a 50% deposit. I was told it will be 60 - 90 days.
Hey man. I went by Zone and ordered mine from them also, on Jan 9th.
MeZadude 8)
sfarnell said:mesadude said:sfarnell said:I order mine last week from Zone music, about 10 miles from the Mesa factory. I paid a 50% deposit. I was told it will be 60 - 90 days.
Hey man. I went by Zone and ordered mine from them also, on Jan 9th.
MeZadude 8)
Yep, you beat me by a few days
I'm pretty sure that we'll get the first two that roll out of the factory. Based on past experience, I'm not optimistic about getting the amp until April. If they say March, be prepared for April.
Did you order the combo or a head? I'm getting the head and if I like it may have a hardwood cab made for it.
clutch71 said:I do have to say that the Mark V has peaked my interest.
Problem is do I go ahead and get a MArk V pre500 or do I wait for Series II? :wink:
Shai`tan said:LOL I rmember everyone holding so tight onto their Mrk IVs cause OMG.... they were being discontinued. Etc etc etc. Now the Mrk Vs are coming, and I bet we see a literal glut of used Mrk IVs back into the Market. hehhhehhehe
And pity the poor SOB who suckered into that "this is the last Mrk IV from Mesa Boogie" ebay sale. Aaaah well. Glad I held out and waited.
boof said:So, who has their names on the waiting list that have hand hands on test runs with the MK V and of those that have put their money down without giving a second thought; why take the leap? Why not just wait till they hit the stores and give it a few laps around the track for a bit to make sure its something that you want?
Enter your email address to join: