Seems a bit extreme to risk the equipment to save move and setup time.
If moving/setting up is the issue, might I recommend a Stage Rig (or something similar)? I don't work for them, know them and actually, never bought anything from them, (bought mine used from a guy who used it with his Rect-O-Verb 2x12)
http://www.stagerig.com/
No idea the moving distance, conditions, amount of equip, etc. But I got one of these to make setup/tear down's take about 5 minutes for me, with my pedal train board. I have my 50 cal 1x12 on one, with an attached power strip, that plugs into my PedalTrain power supply (Dunlop I think, with AC in and out) that then plugs into the wall.
Takes longer to get the guitar out of case than it does to setup amp and board.
Stephen
If moving/setting up is the issue, might I recommend a Stage Rig (or something similar)? I don't work for them, know them and actually, never bought anything from them, (bought mine used from a guy who used it with his Rect-O-Verb 2x12)
http://www.stagerig.com/
No idea the moving distance, conditions, amount of equip, etc. But I got one of these to make setup/tear down's take about 5 minutes for me, with my pedal train board. I have my 50 cal 1x12 on one, with an attached power strip, that plugs into my PedalTrain power supply (Dunlop I think, with AC in and out) that then plugs into the wall.
Takes longer to get the guitar out of case than it does to setup amp and board.
Stephen