T tabl10S Member Joined Sep 17, 2007 Messages 10 Reaction score 0 Jun 18, 2013 #1 I've read $350 and $3000. My "C" is supposedly the first made with SN 11192. I bought it new and fully-loaded as a 20 year old in '83.
I've read $350 and $3000. My "C" is supposedly the first made with SN 11192. I bought it new and fully-loaded as a 20 year old in '83.
H Heritage Softail Well-known member Joined Nov 7, 2009 Messages 942 Reaction score 0 Location Atlanta Ga Jun 18, 2013 #2 About 650 wasmy price quoted. 250 to get up to new component spec as needed. $400 check to mike b.
T tabl10S Member Joined Sep 17, 2007 Messages 10 Reaction score 0 Jun 18, 2013 #3 Thanks. The factory is about a three hour drive, so I might go next Tuesday. I wonder if they would modify it with an IEC out(removable power cord)as replacing the cord with a quality version can change the sound(I'm an Audiophile)? Howard.
Thanks. The factory is about a three hour drive, so I might go next Tuesday. I wonder if they would modify it with an IEC out(removable power cord)as replacing the cord with a quality version can change the sound(I'm an Audiophile)? Howard.
M mikebu Well-known member Joined Nov 16, 2009 Messages 48 Reaction score 0 Location Renton, WA Jun 19, 2013 #4 http://depletedcranium.com/audiophiles-are-silly/
T tabl10S Member Joined Sep 17, 2007 Messages 10 Reaction score 0 Jun 21, 2013 #5 You'll never know until you hear a quality system.