I've been waiting since November 11th for this 2 - 10 venture to be delivered. I understand that I was caught up in this change of cabinet design and my order got held back. Well it's April... I'm through waiting, I bought the M-Pulse 600 head and a single 15 bottom (new design). combined with my Eden 2-10 XLT bottom I can go into the bug extermination business or building demolition when I can't play any more!